When using Management Reporter (MR) with PerformancePoint Server Planning you must take certain things into consideration. To start with you must have a Financial Model as your source for MR. This will give the entity wizard a few things that are required such as currency and a calendar. It is also crucial that the calendar view selected for MR must have Years and Months.
Monday, August 18, 2008
Management Reporter Considerations
Friday, August 15, 2008
Performance Issues with PPS Management Reporter - Update
After months of testing PerformancePoint Server Management Reporter in it's current state, I have concluded that it will not handle the volumes that our company requires. It is way to slow and will just frustrate the business. The problem lies with the whole design of the system. I did a full analysis of the MDX code and how the system operates and found that the client (on your machine) sends an MDX code string to the Analysis Server for every combination of lines in your report to the entities specified in your reporting tree. So if you have a 50 line report and you are running it for 10 entities you will send out 500 MDX queries, one at a time. As you can imagine this makes my ZX81 (with the 64Kb Ram Pack) look like Usain Bolt pumped up on steroids.
Do not despair, all is not lost. I had a very positive conversation last night with some members of the team working on this issue. I suspect that we could see two positives in the near future. The first being a MASSIVE improvement on SQL Server 2008. PPS should be certified to work on SQL Server 2008 by SP2 which is planned for December 2008. Another idea kicked around is changing the architecture to a service type environment on the server and use multi-threading and the power available. I would guess that this type of change would only be done for V2, so let's wait and see. As soon as I get my grubby paws on a copy of SP2 to test I will post an item on performance improvements.
- Paul Steynberg
Saturday, August 9, 2008
Should You Throw Apples at Windows?
- If you have a number of applications open and say for example you have done some work on a new Excel spreadsheet but have not yet saved it, you can just quite Parallels and when you bring it back up again in the future the spreadsheet is waiting for you just as you left it.
- If you receive e-mail attachments via your Mac, say a Word doc, and you double click it on your Mac, it associates it with Word in your VM and opens up your Vista session and presents the document in Word.
